花园园

职位:副院长

职称:副教授

邮箱:huayuanyuan@bucea.edu.cn

发文时间:2026-08-09 撰稿人:

期刊论文:

[1]  Hua, Y. Y., Kang, M. L., Guo, W. Q., & Zhang, S. J. (2026). Effect of BIM application maturity on relational norms in construction projects: mediating role of transaction characteristics. Engineering Construction and Architectural Management.

[2]  Hua, Y. Y., Liu, S. J., Zhang, S. J., Ma, P., & Guo, W. Q. (2026). Effects of BIM Application Maturity on Cooperative Behavior in Construction Projects: The Mediating Role of Relational Governance. Journal of Construction Engineering and Management.

[3]  Hua, Y. Y., Wang, Y. X., Fu, Y. F., & Guo, W. Q. (2025). Mitigating the Transaction Costs of Project Subcontracting Management: The Heterogeneous Effect of Behavior Control and Outcome Control. Buildings.

[4]  Hua, Y. Y., Hou, F. M., Ma, P., Liu, S. J., & Guo, W. Q. (2025). Exploring the impact of project team’s digital capability on innovation performance: an integrated analysis using PLS-SEM and fsQCA. Engineering Construction and Architectural Management.

[5]  Hua, Y. Y., Kang, M. L., Yao, H. J., & Fu, Y. F. (2025). How to Foster Project Organization Resilience in the Construction Industry: The Role of Data Governance Capabilities. Buildings.

[6]  Yang, Y. M., Zhang, S. J., Hua, Y. Y., & Wang, H. (2025). Mapping the digital transformation of AEC industry: Content analysis of digital public policy in China. Developments in the Built Environment.

[7]  Hua, Y. Y., Zhang, Y., & Ma, P. (2024). The mediating effect of BIM application on the link between organizational support and BIM user satisfaction. Architectural Engineering and Design Management.

[8]  Hua, Y. Y., Zhang, Y., Zhang, S. J., Hou, F. M., & Kang, M. L. (2023). Using Building Information Modeling to Enhance Supply Chain Resilience in Prefabricated Buildings: A Conceptual Framework. Applied Sciences-Basel.

[9]  Shi, C. X., Chen, Y. Q., Hua, Y. Y., & Tang, Y. Q. (2022). Understanding subcontracting organizational arrangements for construction projects:integrating capabilities and uncertainty. Engineering, Construction and Architectural Management.

[10]  Kang, F., Li, J. Y., & Hua, Y. Y. (2022). How and when does humble leadership enhance newcomer well-being. Personnel Review.

[11]  Hua, Y. Y., Kang, F., Zhang, S. J., & Li, J. Y. (2022). Impacts of task interdependence and equivocality on ICT adoption in the construction industry: a task-technology fit view. Architectural Engineering and Design Management.

[12]  Tang, Y. Q., Chen, Y. Q., Hua, Y. Y., & Fu, Y. C. (2020). Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter? International Journal of Project Management.

[13]  Ma, P., Zhang, S. B., Hua, Y. Y., & Zhang, J. Y. (2020). Behavioral Perspective on BIM Postadoption in Construction Organizations. Journal of Management in Engineering.

[14]  You, J. Y., Chen, Y. Q., Hua, Y. Y., & Wang, W. Q. (2019). The efficacy of contractual governance on task and relationship conflict in inter-organisational transactions. International Journal of Conflict Management.

[15]  Hua, Y. Y., & Liu, A. M. M. (2017). An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry. Architectural Engineering and Design Management.

[16]  Lu, W. X., Hua, Y. Y., & Zhang, S. J. (2017). Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management.

[17]  花园园,席晓颖,陈爱蒙,陈小燕. (2025). 全过程工程咨询数字化转型的系统设计与实施. 中国招标.

[18]  杨雨苗,张苏娟,花园园,曹冬平. (2025). 多层次 BIM 能力指标研究:基于鄂州花湖国际机场项目案例. 工程管理学报.

[19]  花园园,陈爱蒙,刘思佳,付亚凡. (2025). 参与 “一带一路” 建设的企业法律风险管理能力评价及提升对策研究. 绿色建造与智能建筑.

[20]  杨雨苗,张苏娟,贺桥,花园园,陈珂. (2025). 基于知识图谱的 BIM 能力研究文献计量分析. 项目管理技术.

[21]  花园园,侯凤敏,刘思佳,麻佩,郭文倩. (2025). 数字化能力对工程项目绩效的影响:一个被调节的双中介模型. 科技管理研究.

[22]  花园园,刘思佳,侯凤敏,傅永程,张苏娟. (2024). 数字化能力与创新策略影响工程项目绩效的组态效应. 科技管理研究.

[23]  李庭婷,张苏娟,李亚迪,花园园,姜军. (2024). 我国全过程工程咨询政策文本内容分析 — 基于政策工具视角. 建筑经济.

[24]  花园园,刘思佳,唐吟秋,郭文倩. (2024). 大型工程项目分包的管控机制研究 —— 基于交易成本的视角. 建筑经济.

[25]  花园园,张颖,房电伟,侯凤敏,麻佩. (2023). 工程项目团队数字化能力的形成及对绩效的影响研究. 建筑技术.

[26]  花园园,侯凤敏,张苏娟,王华. (2023). 城市基础设施数据资产价值评价研究. 绿色建造与智能建筑.

[27]  张苏娟,王菲,周红,花园园. (2023). 我国建筑信息模型 (BIM) 政策文本内容研究 —— 基于政策工具视角. 土木工程与管理学报.

[28]  花园园,熊维祥. (2023). 国际工程劳务合规风险管理 —— 以马来西亚项目为例. 中国招标.

[29]  花园园,王雨欣,秦晋. (2023). 合同争议 BIM 模型数据使用权归属问题分析. 中国招标.

[30]  花园园,范亦博,侯凤敏. (2023). 数字化背景下全咨数据治理体系构建. 中国招标.

[31]  花园园,范安迪,李倩. (2023). 美国 AIA 合同系列中 BIM 相关合同协议解析. 中国招标.

[32]  麻佩,花园园,张颖. (2023). 施工企业 BIM 双元应用:组织支持与个体因素的跨层影响机制. 建筑技术.

[33]  花园园,王雨欣,赵宇凡. (2023). 浅析英国 NEC4 施工合同与 CIC BIM 协议的联合应用. 国际工程与劳务.

[34]  花园园,赵宇凡,刘美奇,李倩. (2022). NEC 合同条件中 BIM 相关条款解析. 国际工程与劳务.

[35]  花园园,张颖,杨辉,康飞. (2021). 基于文献计量的 BIM 运维管理研究现状及热点分析. 建筑经济.

[36]  花园园,吕文学,杨志东. (2018). 不可抗力对履约的影响. 国际经济合作.

 

专著:

[1]  花园园.信息技术驱动下建筑业组织变革与演化:基于技术采纳的视角[M].北京:冶金工业出版社,2021, 8.

访问量: 开通时间 :2020-08-17 最后更新时间 :2026-08-09