发文时间:2022-09-01 撰稿人:

期刊文章:

[1]     Chenxi Shi, Yongqiang Chen, Yuanyuan Hua, Yinqiu Tang. Understanding subcontracting organizational arrangements for construction projects in China: integrating capabilities and uncertainty[J]. Engineering, Construction and Architectural Management, 2022.(SCI二区)

[2]     Fei Kang, Jiyu Li, Yuanyuan Hua. How and when does humble leadership enhance newcomer well-being[J]. Personnel Review, 2022. (SSCI二区)

[3]     Yuanyuan Hua, Fei Kang, Sujuan Zhang, et al. Impacts of task interdependence and equivocality on ICT adoption in the construction industry: a task-technology fit view[J]. Architectural Engineering and Design Management, 2021: 1-18. (SCI二区)

[4]     Yinqiu Tang, Yongqiang Chen, Yuanyuan Hua, Yongcheng Fu. Impacts of risk allocation on conflict negotiation costs in construction projects: Does managerial control matter? [J]. International Journal of Project Management, 2020, 38(3),188-199.( 通讯作者,SSCI一区)

[5]     Pei Ma, Shuibo Zhang, Yuanyuan Hua, Jinyue Zhang. Behavioral perspective on BIM postaoption in construction organizations[J]. Journal of Management in Engineering, 2020, 36(1). (SCI一区)

[6]     Jingya You, Yongqiang Chen, Yuanyuan Hua, Wenqian Wang. The efficacy of contractual governance on task and relationship conflict in inter-organizational transactions[J]. International Journal of Conflict Management, 2018. (通讯作者,SSCI二区)

[7]     Yuanyuan Hua, Anita M. M. Liu. An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry[J]. Architectural Engineering and Design Management, 2017, 13(6): 423-438.(SCI二区)

[8]     Wenxue Lu, Yuanyuan Hua, Sujuan Zhang. Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects[J]. Engineering, Construction and Architectural Management, 2017, 24(1): 118-132. (SSI二区)

[9]     花园园,吕文学,杨志东. 不可抗力对履约的影响[J]. 国际经济合作, 2018, 2:70 ~ 76.(中文核心)

[10]  吕文学, 花园园. 基于交易成本的国际工程项目争端预防分析[J]. 国际经济合作, 2010, 1: 69 ~ 73.(中文核心)

[11]  康飞,张颖,花园园.国际工程部分删减情况下承包商的索赔权利分析[J].国际工程与劳务, 2021(01):54-56.

[12]  康飞,张颖,花园园.国际工程中承包商对异常不利气候条件的索赔权利分析[J]. 国际工程与劳务, 2020(11):63-66.

[13]  康飞,李继玉,花园园.FIDIC2017版合同条件中的责任限制条款分析[J].国际工程与劳务, 2021(12):66-68.

[14]  赵雅新,康飞,花园园.国际工程业主财务问题情况下承包商的合同权利分析[J].国际工程与劳务, 2021(08):79-81.

[15]  赵雅新,康飞,花园园.FIDIC2017版合同条件对承包商的索赔通知要求分析[J].国际工程与劳务, 2021(07):72-74.

[16]  赵雅新,康飞,花园园.FIDIC2017版施工合同中对承包商的通知要求分析[J].国际工程与劳务, 2021(06):62-65.

[17]  花园园,康飞,史昕冉.国际PPP项目政府原因终止下的索赔机制分析[J].国际工程与劳务, 2021(05):81-83.

[18]  康飞,赵雅新,花园园.国际工程提前终止情况下LD条款的适用性分析[J].国际工程与劳务, 2021(03):66-68.

会议文章:

[19]  花园园,张颖,杨辉,康飞. 基于文献计量和BIM运维研究现状及热点分析.2021北京工程管理科学学会二等奖,2021.

[20]  Hua Y Y.,  Tang Y Q., Kang F., Zhang Y. Governing complex projects: should more or less subcontractors be involved? 25th International Symposium on Advancement of Construction Management and Real Estate, Wuhan, China, 2020.11.28

[21]  Tang Y Q., Chen Y Q., Hua Y Y., Fu, Y C. Addressing Negotiation Costs in Projects: Role of Risk Allocation and ManagerialControl. Engineering Project Organization Conference, University of Colorado, US, 2019.6.15

[22]  Hua Y Y., Liu A M M., An investigation of person-task-technology interaction and ICT adoption in construction, The Ninth International Structural Engineering and Construction Conference, Valencia, Spain, 2017.07.24-07.29

[23]  Chen B. , Liu A M M., Hua Y.Y., An exploration of the interaction between BIM technology and the business process of a construction organization in BIM implementation, Building Information Modelling (BIM) in Design, Construction and Operations II, WIT Transactions on The Built Environment, Spain, 2017.

[24]  Hua Y Y., Liu A M M., An investigation of person-culture fit and person-task fit on ICT adoption in the Hong Kong construction industry, Integrated Design International Conference, Bath, UK, 2016.06.30-07.01

[25]  Hua Y Y., Liu A M M., Tijhuis W., Interactions of Culture and Person-Technology Fit in ICT Adoption in Construction, CIB Going North for sustainability, London, UK, 2015.11.23-11.25

[26]  Hua Y Y., Liu A M M., Chan I Y S., Culture Dynamics of Information and Communication Technology (ICT) Adoption in Construction Companies, The 2014 Engineering Project Organization Conference (EPOC) on 'Beyond Boundaries', Devil’s Thumb Ranch, CO, US, 2014.07.29-07.31

[27]  Hua Y Y., The Role of Innovation Culture in BIM Diffusion in Construction: Case Studies of Chinese Construction Firms. The 18th Pacific Association of Quantity Surveyors Congress, HongKong, 2014.07.07-07.10

[28]  Hua Y Y., Chan I Y S., Development of a conceptual model for organizational learning culture and innovation diffusion in construction. The 29th Annual Conference of the Association of Researchers in Construction Management (ARCOM), Reading, UK, 2013.09.02-09.04

专著:

[29]  花园园.信息技术驱动下建筑业组织变革与演化:基于技术采纳的视角[M].北京:冶金工业出版社,2021, 8.

访问量: 开通时间 :2020-08-17 最后更新时间 :2022-09-01